I'm having trouble with Outllok 2003.
In the Calendar the date is doubling up - i.e. on the 31 day view, the date is in each days box twice - once in the top left and once in the top right.
The date is also doubled on the Calendar heading - it is displayed like - March 2005 (March 2005).
Any ideas?